Example of annual costs, savings and accumulated savings From an actual Biotrans customer's case study - prepared by UNISA Graduates for a MBA thesis NOTE: the cost of a preserved pole with a Field Liner fitted is calculated by the model used here, and under normal service conditions in most countries, this cost is typically the case cost of the pole plus 33% for the cost of the Field Liner. This is a generic model. Please contact your nearest representative for any assistance that you may need. |
|||
|
ITEM
|
UNIT
|
Amount
|
|
|
Cost of Fully Preserved Pole (Base Cost)
|
R
|
300
|
|
|
Annual Pole Failure Rate (typically 2-5%)
|
%
|
3
|
|
|
Installation Cost of New Pole (typically 5-7 times base cost of the pole)
|
R
|
1000
|
|
|
Replacement of a Failed Pole (typically 7-10 times base cost of the pole)
|
R
|
2000
|
|
|
Annual Project - Poles New
|
|
1000
|
|
![]() |
|||
![]() |
|||
![]() |
|||